Discussions
Top Questions Clients Ask About Architecture & Permits in NYC
Navigating architecture, renovations, and building permits in New York City can feel overwhelming especially with strict regulations, complex zoning laws, and detailed DOB requirements. At ACED Group, located at 5715 18th Ave, Brooklyn, NY 11204, we work closely with clients every day who want clarity before starting their project. To make the process easier, we’ve compiled the top questions clients ask and the answers you need to move forward with confidence.
- Do I really need an architect for my project?
In New York City, most renovations, conversions, and structural changes require an architect. Whether you're opening walls, adding rooms, modifying layouts, or upgrading systems, the DOB often requires stamped architectural drawings. An architect ensures your design is safe, compliant, efficient, and approved without delays. - What types of projects require permits?
Many clients are surprised by how much it requires a permit in NYC. Permits are typically needed for:
Structural changes
Interior layout changes
Electrical and plumbing work
Mechanical installations
Extensions or additions
Conversions (e.g., basement to living space)
Even smaller projects may need approval depending on the building type and zoning regulations.
- How long does the permit process take?
Timing varies by project complexity, DOB workload, and document completeness. A simple filing may take a few weeks, while larger renovations can take 1–3 months or more. At ACED Group, our expediting team ensures filings are accurate and complete to help shorten review times and reduce back-and-forth with the city.
4. What is zoning, and why does it matter?
Zoning determines what can be built and where. It affects:
Building height
Lot coverage
Use (residential, commercial, mixed-use)
Setbacks
Extensions and additions
A zoning analysis ensures your project aligns with city regulations before you begin, preventing costly redesigns later.
- Can I start work without a permit?
In most cases, no. Starting work without proper permits can lead to:
Stop-work orders
Fines
Delays
Legal issues
Problems when selling the property
Working with a licensed architect and expediting team protects you from violations.
- What are the most common delays in NYC construction approvals?
Clients often run into delays because of:
Missing documents
Incorrect drawings
Incomplete zoning reviews
Unresolved violations
Unexpected DOB objections
ACED Group helps prevent these issues by managing paperwork, catching errors early, and responding quickly to DOB requests.
- How much will my project cost?
Costs depend on project type, size, materials, labor, and structural needs. Architectural fees vary based on scope, complexity, and permit requirements. We provide clear, upfront estimates so clients always know what to expect.
8. What is the benefit of hiring ACED Group?
Clients choose ACED Group because we simplify complex NYC processes. Our services include:
Architectural Design
Space Planning
Zoning & Code Analysis
DOB Filing & Permit Expediting
3D Renderings
Project Coordination
From concept to approval, we ensure your project is smooth, transparent, and fully compliant.
- Will my design need to change after filing?
Sometimes DOB reviewers request adjustments to meet safety or zoning standards. When this happens, our team revises drawings promptly to keep your project moving forward. - How do I get started?
It begins with a consultation. We review your goals, analyze your property, and outline the best path for design and permit approval. With ACED Group, you're guided every step of the way.
Build with Confidence
Tackling NYC architecture and permits doesn’t have to be stressful. With ACED Group by your side, you get expert guidance, precise planning, and a clear roadmap from concept to construction.
Learn more:
Website URL: https://www.acdegroup.com/
Address: 5715 18th Ave, Brooklyn, NY 11204, United States
Phone: +17188533093